Concrete cost calculator

Enter the length and width, pick what is being poured, and tick removal if old concrete has to come out first. The range uses the same published rates as the cost guide.

42

Published rates are a guide for budgeting. The price for your job is the one on the written quote after a site measure.

Turn this into a written quote

Measuring up in five minutes

  1. Break the job into rectangles. A driveway with a flared apron is a long rectangle plus a short wide one. Work each out and add them.
  2. Pace it if you have no tape. A long adult stride is close to a metre, which is near enough for a budget.
  3. Measure the concrete, not the block. Garden beds, the footpath and the council verge are not part of your slab.
  4. Leave the crossing out at first. The strip between boundary and kerb is priced with the job but built to the council's standard, so run it as a separate line if you want to see it.

What the range leaves out

The figure covers supply and laying at the published rate. It does not know about a pump where a truck cannot reach, unusual amounts of ground preparation, retaining edges on a steep block, drainage pits, or council application fees. Those are found at the site measure and written into the quote, which is why a range is the right answer at this stage and a single number is not.

Next reading: the Section 138 guide if the job meets the street, the specification for what belongs under the slab, and the shed slab cost guide for worked garage and shed sizes.